Menu

Saifeddin BOUROGAA

KRAM

En résumé

More than 9 years experience in the power generation and O&G sector in:

- E&I Engineering
- Project management
- Construction
- Commissioning and start up
- Maintenance

Available for new opportunities.

Mes compétences :
Etap 7.0
Ms office
Caneco BT
Autocad
Dialux/Calculux
VersaPro
Proficy Machine Edition
Cimplicity 7.5
Automation
Electrical
Instrumentation
Project
Engineer
Engineering
Construction
ATEX

Entreprises

  • GIE - BOUCHAMAOUI INDUSTRIES & MAX STREICHER JV - E&IC Project Manager

    2017 - maintenant Nawara Pipeline Project / OMV (Tunesien) Production GmbH.
  • Horizon Company - Technical & Sales Manager

    2015 - maintenant
  • CERI - Project Manager Elec/Inst

    Tunis 2014 - 2015 Cliquez pour modifier la description du posteProject: Sousse Phase D, 400MW Combined Cycle Power Plant (Tunisia)

    http://www.ceritunisie.com
  • SOMOIL (Angola) - Maintenance Instrument Supervisor

    2014 - 2014 Maintenance of all sites owned by SOMOIL.

    - Waukesha-Dresser Gas compressor
    - MURPHY control system installation, troubleshooting and programming
    - Well head instrumentation
    - Pneumatic chemical injection pumps
    - Arrow gas motor / Beam pumps Weatherford-Ampscott
    - Electro-pneumatic and pneumatic-pneumatic instrumented systems
  • SNC Lavalin - Commissioning Engineer

    Ivry-sur-Seine 2013 - 2014 commissioning and start-up activities for the new Combined Cycle Power Station in Tunisia with STEG (Tunisian Company of Electricity and Gas)
  • SEREPT - Project and Maintenance E&I Engineer

    Hammam Lif 2012 - 2013 Working as support and project engineer for offshore team with the I&E Maintenance department SEREPT, leading engineering, maintenance, commissioning and startup operations in Ashtart field production facilities that consist of: (5) platforms and (1) FSPO (named IFRIKIA II).

    - ESD sytem audit and upgrade to SIL2
    - New H2S detection and signaling system
    - Retrofit of WATER BALLAST PUMP at IFR II
    - Retrofit of Debutanization Unit
    - Revamping of SIEMENS Gas Turbine Pump (Ruston TB4000 Gas Turbine dual fuel)
    - Precommissionig, commissioning and Startup: Conformity ChecK Sheet (CCK), OTP (Operational Test Procedure), FTS (Functional Test Sheet), System and Subsystem Precomm & Commissioning Dossiers, Punch list
    - DCS, PLCs programs, safety logic diagrams and ESD Cause & Effect matrix
    - Work Packs Mark-Up
  • BEENDER OVERSEAS - Ingénieur de Projet

    2012 - 2012 -All engineering activities including preparation of standard required documents for client
    - Supervising all electrical & instrumentation activities
    - Pre-commissioning, Commissioning and start up
    - Final Documents
  • SACNA - Ingénieur de Projet

    2010 - 2011 - Technical & commercial proposal preparation (E&I)
    - Detail engineering
    - Preparing all material’s RQFs, review and approval of vendor documents
    - Construction supervisor (all electrical & instrumentation works)
    - Pre-commissioning, Commissioning and start up
    - Preparing As-Built Documents
  • PSI - Chef de Projet

    2008 - 2010 Engineering, design and technical-commercial proposal preparation for:
    - Low Voltage Distribution Panels
    - Electric Tracing and Thermal Insulation
    - Chargui-3 Tie Back Flowline at Kerkennah onshore -PETROFAC Tunisia
    - Djebel Grouz Project Ph2: Oil Center Relocation - ENI Tunisia
    - SCSSV and SSV control panels of TSIENGUI and OBANGUE field wells - ADDAX Gabon (participation)
    - Gas Expansion Skids for the control panels of TSIENGUI and OBANGUE field wells - ADDAX Gabon (participation)
    - Niungo Upgrade Phase 3 Project: Chemical Injection Skids - PERENCO Gabon
    - Custody Transfer Fiscal Metering Skid Project at the Maamoura and Baraka plant - ENI Tunisia

Formations

  • Ecole Nationale des Ingénieurs Sfax (Sfax )

    Sfax 2005 - 2008 Ingénieur
  • Institut Préparatoire Aux Etudes D'Ingénieur De Sfax (IPEIS) (Sfax)

    Sfax 2003 - 2005

Réseau

Annuaire des membres :