Project manager of two projects:
Project 1: Rehabilitation and extension of MV distribution network;
Project 2: Construction of new national dispatching.
-
Fichtner Gmbh & Co.kg
- Resident Engineer
2016 - 2016
Rehabilitation, extension of 4 AIS substations 220 kV, with new Scada systems and interface with national dispatching
-
Fichtner GmbH & Co.KG
- Acting Project Director and Consultant for the HVAC substations, HVDC conversion and transmission
2013 - 2016
220kV AC substation and conversion and transmission HVDC +-500kV.
rehabilitation of the AC substation 220kV, 2x280MW valve thyrisors and HVDC substation and HVDC lines(1800kM) +-500kV.
-
Mel Electric
- Freelancer
2007 - 2013
Mel Electric di Mohammed El Makkaoui (
own entrepreneur)
* Electric Protection and commissioning engineer; ;
* Commissioning manager; ;
* Senior Engineer for control and revision project; ;
* Site manager; ;
* Deputy Project Director and Resident Engineer;
SOME PROJECT * Commissioning MV systems 3 switchgears (88 feeders), protective relays testing and startup for TAWEELAH new B extension (Abu Dhabi Emirates Arab united) Fisia Ital-impianti 4 MSF desalination units, Switchgears and protection Relays (Siemens) including fault analysis, protection relays and Switching training for the customer exploitation team;
* Site and commissioning manager and team leader for HV/MV substation (Kampala Uganda), 2 lines 132 kV, 3 power transformers HV/MV, 2 incomers from generators 18 MVA, 19 lines 30kV, LV services and RTU interfaces, protection systems Areva and Siemens protection Relays (Siemens);
* * Commissioning electrical and protection system, engineer leader for HV/MV substation for Duferco foundry (Brescia Italy), 2 lines HV, 5 HV/MV power transformers HV/MV, protection relays Sepam (Schneider Electric);
* Commissioning for general maintenance and protective relay overhaul HV/MV substation and 11 substations MV/LV control and testing (ST microelectronics Catania Italy) maintenance yearly from 2008 to 2012 including training for customers personals in protection and operating switching, protection systems Sepam Schneider and Ref (ABB) and power transformer fault analysis;
* Commissioning electrical and protection system Siprotec relays, engineer leader for HV/MV substation wind power plant (Salemi Italy), 1 HV line, 1power transformer MV/H, 5 incomings MV from wind generators (Siemens);
* Commissioning electrical and protection system Siprotec relays, engineer leader for HV/MV substation wind power plant (Rocca Ficuzza Italy), 1 HV line,1 power transformer MV/HV, 3 incomings from wind generators (Siemens);
* Commissioning electrical and protection system Siprotec relays, engineer leader for HV/MV substation wind power plant (Lago Arancio Italy), 1 HV line, 1 power transformer MV/HV, 7 incomings from wind generators (Siemens);
* Commissioning and protection system Siprotec Micom relays for HV/MV substation extension Thyna (Sfax Tunisia) 2 lines HV (AnsaldoT&D);
* Commissioning electrical and protection systems HV MV LV for the power plant Bahia Las Minas Panama, SEL and ABB relays (Sadelmi);
* Site manager, commissioning and startup the mobile substation 220/60/20kV (6th October City Egypt) Siprotec and Micom Relays (Siemens); ;
-
CONSULTING SERVICE COMPANY
- OWN ENTREPRENEUR
2007 - 2013
DUTIES:
* Owner and General Manager;
* Lead Commissioning Engineer of electrical and protection HV substation systems;
* Commissioning and Lead Engineer;
* Senior Engineer for control and revision project;
* Commissioning Manager;
* Trainer of Clients Engineers and technicians teams in operating switching and
protection systems in High and Medium voltage substations;
* Site Manager;
* Inspect, verification and evaluation of existing substations;
* Consultant Engineer;
* Participation in preparation of tender documents;
* Start up and hand over;
* Prepare technical note and protection setting documents.
SOME KEY PROJECTS:
* Construction of TAWEELAH new B extension (Abu Dhabi Emirates Arab united) 4
MSF desalination units, Constructor Fisia Ital-impianti, (turnkey contract).
Duty:
- Commissioning and startup of the electrical MV/LV and protection systems;
- Trainer of Customer Engineers in switching and protection systems;
- Interface the protection systems with DCS system.
* Construction of 132/30 kV GIS substation and overhead transmission lines part to
connect the new substation to the grid (Kampala Uganda), Constructor Siemens,
(turnkey contract).
Duty:
- Site and Commissioning Manager;
- Interface the protection systems with RTU;
- Review of all project engineering;
- Handover.
* Rehabilitation of HV/MV substation AIS (Duferco foundry/ Brescia Italy),
Constructor Schneider Electric, (turnkey contract).
Duty:
- Commissioning and Protection Engineer;
- Interface the protection systems with Scada system.
* Rehabilitation of HV/MV substation AIS Vigentina (Milan Italy), Project owner
(A2A) Milan public utility.
Duty:
- Consultant engineer and HV substation expert.
Duty:
- Commissioning and Protection Engineer;
- Review of the protection system coordination;
- Interface and coordination with Head Office of Factory Maintenance.
* Construction of 220/30 kV AIS substation wind power plant (Salemi Italy),
Constructor Siemens, (turnkey contract).
Duty:
- Commissioning Manager and Protection Engineer;
- Interface the protection systems with Scada system;
- Site Manager.
* Construction of 220/30 kV AIS substation wind power plant with inter-stations
underground cables (Rocca Ficuzza Italy), Constructor Siemens, (turnkey contract).
Duty:
- Commissioning Manager and Protection Engineer;
- Interface the protection systems with Scada system;
- Startup and handover.
* Construction of 220/30 kV AIS substation wind power plant (Lago Arancio Italy),
Constructor Siemens, (turnkey contract).
Duty:
- Commissioning Manager and Protection Engineer;
- Interface the protection systems with Scada system;
- Startup and handover.
* Extension of HV AIS substation Thyna (Sfax Tunisia), Constructor Ansaldo T&D,
(turnkey contract).
Duty:
- Commissioning Manager and Protection Engineer;
- Interface the protection systems with Scada system;
- Startup and handover.
* Repowering and extension Project of Bahia Las Minas Power Plant (Panama),
Constructor Sadelmi-Busi Power, (turnkey contract).
Duty:
- Commissioning Manager and Protection Engineer of :
* Electric substation 115 kV;
* Auxiliary systems and services;
- Interface the protection systems with Scada system.
* Construction of 220/60/22 kV GIS mobile substation (6th October City Egypt) and
with (3) interconnection cables to existing AIS substation, Constructor Siemens,
(turnkey contract).
Duty:
- Site Manager, responsible of handover;
- Startup and handover;
- Negation of claims solving.
-
Mel Electric
- Freelance protection and commissioning engineer
2007 - 2013
-
Veca Electric
- Bergamo Italie
2003 - 2007
-
CONSTRUCTION COMPANY VECA ELECTRIC
- ENGINEER & MANAGER
2003 - 2007
DUTIES:
* Electric and protection engineer;
* Construction manager;
* Manage the Electromechanical Constructions (wiring of panels and switchgears);
* Procurement and management of materials;
* Responsible of testing and commissioning;
* Manage and conduct Factory Test Acceptance (FAT);
* Management and development of new products;
* Quality control and final test manager;
* Senior protection engineer;
* Accountable for managing the delivery of critical projects, and for providing
managerial support for all the projects conducted by the company;
* Production Manager;
* Manage the ISO 9001certification process.
-
Veca Electric
- Test manager & Senior protection Engineer
2003 - 2007
Construction and wiring of panels and switchgears including testing and responsibility role;
Construction production and testing panels MCC;
Management and development for new products;
Quality control and final test manager;
Senior protection Engineer;
Some project :
-
ELECTRICAL INSTALLATION COMPANY
- ELECTRIC ENGINEER
2000 - 2003
ELECTRICAL INSTALLATION COMPANY TECNO-SYSTEM (MILAN ITALY)
DUTIES:
* Technical office and customers service;
* Commissioning LV installations.
-
Tecno-System
- Technical office for installation and customers service
2000 - 2003
Technical office for installation and customers service;
Commissioning LV Installation;