Menu

Clovis Hervé KEMKENG JAGUÉ

ABIDJAN

En résumé

I am Mobile, versatile and dynamic, today I wish to develop my skills within a growing business group and emerging as yours, in order to optimize yields in production, take the time to carrying out work in the best conditions of safety, quality and cost.

Entreprises

  • SIPEL SA IVORY COAST - ENGINEER RESPONSIBLE FOR TECHNICAL WORK: ELECTRICAL AND MECHANICAL ENGINEERING

    2012 - maintenant I- REALIZATION OF PROJECT PREPARATION

    a) Preparation of schedules; definition of technical means; evaluation of labor curve.
    b) Organization of supplies of materials, and tools. Ensure follow consumption.
    c) Planning staff activities on construction sites and Works assignments.
    d) Realization of Materials Applications - Realization of purchase orders for materials and good purchases of materials.
    e) Implementation and monitoring of the table Procurement materials.

    II- MONITORING OF WORKS AND PROMOTIONS

    a) Validation of monitoring implementation plans and technical data in collaboration with the consulting firm, the client and control offices - Monitoring and updating of implementation plans and planning
    b) Implementation monitoring work in the best time conditions; of security; of quality and cost.

    III- STUDY AND EXECUTION OF WORK.

    a) Choice of SM6 cellule SCHNEIDER for HTA positions - Realization of siting and installing
    b) Selecting SCHNEIDER Transformers Dry type and oil immersed type 20 / 15KV dual voltage: 2000KVA - 1600KVA -1000KVA and 800 KVA for the provision of energy - Realization siting and installation, testing and commissioning
    c) Selection of Generators CATERPILLAR & SDMO 1500 KVA - 1000 KVA for the production of energy aid and security - Installation; management powers; fillers synchronization
    d) Monitoring and study choices, followed by installation and commissioning of 3 APC UPS SCHNEIDER ELECTRIC MGE GALAXY 7000 to 200 KVA
  • Groupe Bouygues - TECHNICAL ENGINEER DRIVER WORK: ELECTRICAL AND MECHANICAL ENGINEERING

    Paris 2010 - 2012 I- MONITORING OF THE WORK OF REALIZATION THE IMPLEMENTATION PLANS: ELECTRICITY HIGH CURRENT - LOW CURRENT ELECTRICITY - PLUMBING - Air conditioning - Ventilation - Central Air handling, Chiller - Safety and Fire Detection System
    a) Monitoring of work execution plans of all State Technical Corps, according to CCTP, DTU, applied to the work of buildings since the APD plans APS plans and execution plans
    b) Issue tracking equipment and supplies - Monitoring equipment orders and purchases
    c) Tracking and managing subcontractor any State Technical: Electricity CFO / CFA, SSI, HVAC, Plumbing
    d) Monitoring and made systematic daily schedules of works.
    II- MONITORING IMPLEMENTATION OF THIS WORK.

    a) Execution monitoring the work of High Current Electricity respecting the standards: NFC 15-100 NFC 13-100 NFC 14-100 NFC 17-100 following the rules and the relevant articles. And many other standard applicable to Electrical installations and protection of goods and people
    - Tracking Power balance studies and realization diagrams of electrical circuits.
    c) Follow siting and installation 3 cellules types SM6 MV Schneider. Monitoring the Works of making a local transformer and installation of 3 transformer of 1600 kVA - 20 / 15KV dual voltage
    d) Tracking studies, Installations and commissioning of 4 Generators OLYMPIAN GEP Caterpillar 500 - Installation and commissioning of 4 Generators Caterpillar 1000KVA generators synchronized with load priority; boot order ISOHRONE mode.
  • EMERSON PROCESS MANAGEMENT - ELECTRICAL/INSTRUMENTATION TECHNICAL COMMERCIAL AND MARKETING ENGINEER

    BRON 2009 - 2010 Customer Management:
    - Oil rig TOTAL – PERENCO – PECTEN – COMPANY – COTCO - SOGAFRIC
    - Gas distribution network COTCO of DOMPTA and BELABO – Refinery SONARA
  • RW-KING CAMEROUN - DEPARTMENT MATFORCE – MATELEC – SAE. - ENGINEER TECHNICAL - COMMERCIAL AND SERVICES AFTER SALE

    Les Ulis 2007 - 2008 AFTER SALES SERVICES: COMPRESSORS AND GENERATORS: Atlas Copco – SDMO – PERKINS – LISTER PETER
    LIST OF MONITORING CUSTOMERS: SONARA – CIMENCAM – NESTLE CAMEROON – ORANGE – MTN – CAMRAIL.
  • Saipem - Electro-mechanical engineer and INSTRUMENTISTE

    Montigny-le-Bretonneux 2006 - 2007 Construction of an oil rig platform drilling SAIPEM TAD

Formations

  • University Institute Of Technology (Douala)

    Douala 2005 - 2007 BACHELOR'S DEGREE IN ENGINEERING INDUSTRIAL MAINTENANCE

Réseau

Annuaire des membres :