HICHEM ZOUABI

HICHEM ZOUABI

Projeteur E&I, EPPM
 

En poste chez EPPM

Précédents : EPPM, EMCO, Durée

 

Précédents : Institute Of Technology Study, Technical High School, Technical High School In Hannibal Ariana

Parcours

Electrical and instrumentation designer

Chez EPPM

De June 2014 à December 2014
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Outils/méthodes/environnement Autocad, Word, Excel, Dialux
 

Electrical and instrumentation designer

Chez EPPM

De June 2014 à December 2014
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Outils/méthodes/environnement Autocad, Word, Excel, Dialux
 

Electrical and instrumentation designer

Chez EPPM

De June 2014 à December 2014
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Outils/méthodes/environnement Autocad, Word, Excel, Dialux
 

Electrical and instrumentation designer

Chez EPPM

June 2014
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Outils/méthodes/environnement Autocad, Word, Excel, Dialux Results ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

June 2014
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Outils/méthodes/environnement Autocad, Word, Excel, Dialux Results ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

June 2014
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Outils/méthodes/environnement Autocad, Word, Excel, Dialux Results ...
Lire la suite
 

ELECTRICAL & INSTRUMENTATION DESIGNER

Chez EPPM

De April 2014 à May 2014
Objective of the mission establishment of As-built plans Tasks performed * Establishment of electrical detailed plans * Site visit & establishment of As-built plans(cable routing, tagging, earthing, single line diagram, lighting layout, inspection of cable trench) * Inspection of ...
Lire la suite
 

electrical & instrumentation designer

Chez EMCO

De April 2014 à May 2014
Objective of the mission establishment of As-built plans Tasks performed * Establishment of electrical detailed plans * Site visit & establishment of As-built plans(cable routing, tagging, earthing, single line diagram, lighting layout, inspection of cable trench) * Inspection of ...
Lire la suite
 

ELECTRICAL & INSTRUMENTATION DESIGNER

Chez EPPM

De April 2014 à May 2014
Objective of the mission establishment of As-built plans Tasks performed * Establishment of electrical detailed plans * Site visit & establishment of As-built plans(cable routing, tagging, earthing, single line diagram, lighting layout, inspection of cable trench) * Inspection of ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De April 2013 à December 2013
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Tools/methods/environment Autocad, Word, Excel Results Admitted Client ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De April 2013 à December 2013
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Tools/methods/environment Autocad, Word, Excel Results Admitted Client ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De April 2013 à December 2013
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Tools/methods/environment Autocad, Word, Excel Results Admitted Client ...
Lire la suite
 

Electrical & instrumentation designer

Chez EPPM

De April 2013 à October 2013
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Establishment of detailed plans (electrical and instrumentation) * Site visit & establishment of As-built plans ; * Meeting with the client and update ...
Lire la suite
 

ELECTRICAL & INSTRUMENTATION DESIGNER

Chez EPPM

De April 2013 à October 2013
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Establishment of detailed plans (electrical and instrumentation) * Site visit & establishment of As-built plans ; * Meeting with the client and update ...
Lire la suite
 

ELECTRICAL & INSTRUMENTATION DESIGNER

Chez EPPM

De April 2013 à October 2013
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Establishment of detailed plans (electrical and instrumentation) * Site visit & establishment of As-built plans ; * Meeting with the client and update ...
Lire la suite
 

Electrical and instrumentation designer

Chez Durée

De March 2013 à August 2013
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Tools/methods/environment Autocad Results Admitted Client PETROFAC ...
Lire la suite
 

Electrical and instrumentation designer

Chez Durée

De March 2013 à August 2013
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Tools/methods/environment Autocad Results Admitted Client PETROFAC ...
Lire la suite
 

Electrical and instrumentation designer

Chez Durée

De March 2013 à August 2013
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Tools/methods/environment Autocad ,
 

Electrical and instrumentation designer

Chez Durée

De March 2013 à August 2013
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Tools/methods/environment Autocad Results Admitted Client PETROFAC ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De September 2012 à December 2012
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Tools/methods/environment Autocad Results Admitted Objective of the ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De September 2012 à December 2012
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Tools/methods/environment Autocad Results Admitted Objective of the ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De September 2012 à December 2012
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Tools/methods/environment Autocad Results Admitted Objective of the ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De September 2012 à December 2012
Objective of the mission Detailed design for electrical & instrumentation installation Tasks performed * Detailed design for electrical installation ; * Detailed design for instrument installation Tools/methods/environment Autocad Results Admitted Objective of the ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De July 2012 à January 2013
Objective of the mission Establishment of electrical and instrumentation plans Tasks performed * Establishment of detailed plans (electrical and instrumentation) * Establishment of data sheets ; * Establishing material take off, bulk materiel Tools/methods/environment ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De July 2012 à January 2013
Objective of the mission Establishment of electrical and instrumentation plans Tasks performed * Establishment of detailed plans (electrical and instrumentation) * Establishment of data sheets ; * Establishing material take off, bulk materiel Tools/methods/environment ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De July 2012 à January 2013
Objective of the mission Establishment of electrical and instrumentation plans Tasks performed * Establishment of detailed plans (electrical and instrumentation) * Establishment of data sheets ; * Establishing material take off, bulk materiel Tools/methods/environment ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De July 2012 à January 2013
Objective of the mission Establishment of electrical and instrumentation plans Tasks performed * Establishment of detailed plans (electrical and instrumentation) * Establishment of data sheets ; * Establishing material take off, bulk materiel Tools/methods/environment ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De January 2012 à May 2012
Objective of the mission Establishment of electrical and instrumentation plans Tasks performed * electrical and instrumentation plans Tools/methods/environment Autocad Results Admitted
 

Electrical and instrumentation designer

Chez EPPM

De January 2012 à May 2012
Objective of the mission Establishment of electrical and instrumentation plans Tasks performed * electrical and instrumentation plans Tools/methods/environment Autocad Results Admitted
 

Electrical and instrumentation designer

Chez EPPM

De January 2012 à May 2012
Objective of the mission Establishment of electrical and instrumentation plans Tasks performed * electrical and instrumentation plans Tools/methods/environment Autocad Results Admitted
 

Electrical and instrumentation designer

Chez EPPM

De January 2012 à May 2012
Objective of the mission Establishment of electrical and instrumentation plans Tasks performed * electrical and instrumentation plans Tools/methods/environment Autocad Results Admitted
 

Electrical and instrumentation designer

Chez EPPM

De October 2011 à May 2012
Objective of the mission electrical and instrumentation detail, re-refining plant Tasks performed * Detailed design for electrical installation ; * Execution of detailed plans (electrical and instrumentation) Tools/methods/environment Autocad Results Admitted Client ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De October 2011 à May 2012
Objective of the mission electrical and instrumentation detail, re-refining plant Tasks performed * Detailed design for electrical installation ; * Execution of detailed plans (electrical and instrumentation) Tools/methods/environment Autocad Results ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De October 2011 à May 2012
Objective of the mission electrical and instrumentation detail, re-refining plant Tasks performed * Detailed design for electrical installation ; * Execution of detailed plans (electrical and instrumentation) Tools/methods/environment Autocad Results Admitted Client ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De October 2011 à May 2012
Objective of the mission electrical and instrumentation detail, re-refining plant Tasks performed * Detailed design for electrical installation ; * Execution of detailed plans (electrical and instrumentation) Tools/methods/environment Autocad Results Admitted Client ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De April 2011 à April 2012
Objective of the mission Design, supply and construction of a loading crude tasks performed * Detailed & basic design for electrical installation (cable routing, earthing, lighting layout, lightning protection, single line diagram, * Detailed & basic design for instrument ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De April 2011 à April 2012
Objective of the mission Design, supply and construction of a loading crude tasks performed * Detailed & basic design for electrical installation (cable routing, earthing, lighting layout, lightning protection, single line diagram, * Detailed & basic design for instrument ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De April 2011 à April 2012
Objective of the mission Design, supply and construction of a loading crude tasks performed * Detailed & basic design for electrical installation (cable routing, earthing, lighting layout, lightning protection, single line diagram, * Detailed & basic design for instrument ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De April 2011 à April 2012
Objective of the mission Design, supply and construction of a loading crude tasks performed * Detailed & basic design for electrical installation (cable routing, earthing, lighting layout, lightning protection, single line diagram, * Detailed & basic design for instrument ...
Lire la suite
 

ELECTRICAL & INSTRUMENTATION DESIGNER

Chez EPPM

De September 2011 à December 2011
Objective of the mission Establishment As-built plans Tasks performed * Establishment of detailed plans (electrical and instrumentation) * Establishment of data sheets ; * Calculation of Cable sections ; * Establishing material take off, bulk materiel ; * ...
Lire la suite
 

Electrical & instrumentation designer

Chez EPPM

De September 2011 à December 2011
Objective of the mission Establishment As-built plans Tasks performed * Establishment of detailed plans (electrical and instrumentation) * Establishment of data sheets ; * Calculation of Cable sections ; * Establishing material take off, bulk materiel ; * ...
Lire la suite
 

ELECTRICAL & INSTRUMENTATION DESIGNER

Chez EPPM

De September 2011 à December 2011
Objective of the mission Establishment As-built plans Tasks performed * Establishment of detailed plans (electrical and instrumentation) * Establishment of data sheets ; * Calculation of Cable sections ; * Establishing material take off, bulk materiel ; * ...
Lire la suite
 

Electrical and instrumentation designer

Chez EPPM

De September 2011 à December 2011
Objective of the mission Establishment As-built plans Tasks performed * Establishment of detailed plans (electrical and instrumentation) * Establishment of data sheets ; * Calculation of Cable sections ; * Establishing material take off, bulk materiel ; * ...
Lire la suite
 

Institute Of Technology Study, Tunis

Scottish Highers, Institute of Technology study

De February 2008 à June 2010
Higher Senior Technician Electrical Engineering Technician training (company: office Arab Libyan Tunisian study)& end of study project (company: multi services elevators)
 

Institute Of Technology Study, Tunis

Scottish Highers, Institute of Technology study

De February 2008 à June 2010
Higher Senior Technician Electrical Engineering Technician training (company: office Arab Libyan Tunisian study)& end of study project (company: multi services elevators)
 

Institute Of Technology Study, Tunis

Scottish Highers, Institute of Technology study

De February 2008 à June 2010
Higher Senior Technician Electrical Engineering Technician training (company: office Arab Libyan Tunisian study)& end of study project (company: multi services elevators)
 

Technical High School In Hannibal Ariana, L'Ariana

Scottish Highers, Technical High School in Hannibal Ariana

De September 2006 à June 2007
Higher Senior Technician Electrical Engineering Technician training (company: office Arab Libyan Tunisian study)& end of study project (company: multi services elevators)
 

Technical High School, L'Ariana

Baccalaureate Degree, Technical High School

De September 2006 à June 2007
 

Compétences

 
  • Air Compressors
  • Autocad
  • basic design
  • Cathodic Protection
  • Circuit Breakers
  • Design
  • Detailed design
  • DIALux
  • Voir toutes les compétences (22)

Langues parlées

 
  • français
  • arabe
  • anglais